Short answer: Our sample MOQ is 30 units, and our bulk MOQ is 300. But the number that can hold up your order is often the fabric mill's minimum per colour. Before planning your SKUs, check three minimums: sample, bulk, and material. Then decide whether to consolidate colours or use a stock fabric.
Key takeaways
• Sample MOQ: 30 units. Bulk MOQ: 300 units (our standard terms). • Fabric mills set a minimum production run per colour. This can be higher than the amount needed for 300 bags. • Sampling takes 7–12 days. Production takes 45–55 days after sample approval and deposit. • We have supplied a premium German e-bike brand since 2016, growing from 500 units a year to 5,000 units per month. • The cheapest first order is usually the one that avoids both dead stock and a second dye lot.
How we verified this
This guide is for European bike-brand product managers and first-time private-label buyers planning their first or second production run.
The MOQ and lead time figures are our standard terms, checked against our own order records.
The fabric minimums are based on how we work with our material mills. Before confirming a bag price, we ask each mill for its minimum production run per colour.
We don't publish one mill's minimums as if they apply everywhere. The numbers vary depending on the fabric, colour, and season.
The three minimums buyers confuse
A custom bike bag order usually involves three separate minimums. They come from different parties, but only one typically appears on the bag quotation.
• Sample minimum. The quantity the factory needs to produce your approved sample. Our sample MOQ is 30 units. • Bulk minimum. The quantity the factory needs to run production efficiently. Our bulk MOQ is 300 units. • Material minimum. The quantity the fabric or trim mill needs to produce your chosen colour. This is quoted in metres per colour, not in bags.
The first two are commercial requirements. The third comes from the production process. A mill has to set up a dye lot or coating run, and it won't do that for just a few rolls.
Why the fabric minimum is the real gate
Your bag MOQ may be 300 units, but the fabric minimum can still determine whether your launch goes ahead as planned.
A 300-piece order may use only a modest amount of fabric per colour. If you plan four colours, you're not buying one material run. You're buying four separate colour runs.
Each colour may have its own minimum.
The problem isn't always a higher bag price. Sometimes, it's the unused fabric left sitting in a warehouse.
That's why a supplier who only tells you the bag MOQ is giving you half the picture.
Before approving a quotation, ask:
• What is the fabric minimum in metres per colour? • Is this a stock fabric or a custom dye lot? • If we add another colour later, will it trigger a new minimum? • Which trims, such as webbing, binding, zip tape, and logo labels, have their own minimums?
If the answer is "we will confirm later," the risk is still yours. Get these answers before issuing the PO, not after paying the deposit.
How to plan a first order without dead stock
There are four practical ways to keep your first order lean.
Consolidate colours. Using one or two colours across more SKUs usually works better than offering four colours for one SKU. You reduce the material minimums you need to meet while keeping the range consistent.
Use a stock fabric for the first run. A stock colour can help you avoid a custom dye lot. You give up some exclusivity, but you can start with a smaller order and a shorter lead time.
Phase the range. Launch the core size and colour first. Add more variants once you see how the products sell. This is a common approach for European brands testing a new product category.
Separate sample and bulk planning. The 30-unit sample run is for approval, not retail sale. Don't let your sample quantity commit you to a material minimum that you may struggle to sell through.
How we quote it
We quote the three minimums separately: sample, bulk, and material.
If the fabric minimum is higher than your order can use, we'll tell you before you approve the sample, not afterwards.
For a premium German e-bike brand, we started supplying 500 units a year in 2016. Today, the account runs at 5,000 units per month. That growth came from repeating proven constructions and materials, rather than introducing a new colour every season.
Our standard lead times are 7–12 days for sampling and 45–55 days for production after sample approval and deposit.
If your design needs a custom fabric colour, the material minimum can affect the schedule. That's why we discuss it from the beginning.
Limitations
• Fabric minimums vary by mill, fabric, colour, and season. Always confirm the minimum for your specific material. • Stock fabrics can change or sell out. We check availability for each order. • MOQ can sometimes be reduced through a stock programme, but this isn't possible for every construction. • This guide covers bag and material minimums, not freight or payment terms.
FAQ
Is the sample MOQ really 30 units?
Yes. Our standard sample MOQ is 30 units. The sample run is for checking fit, materials, and construction before approval. It's not intended for retail sale.
Is the bulk MOQ always 300?
Our standard bulk MOQ is 300 units. Some constructions or materials may require a higher quantity. We confirm this before quoting.
Can I mix colours to reach the bulk MOQ?
Often, yes. But each colour may have its own fabric minimum. Mixing colours can help you meet the bag MOQ while creating a separate material minimum problem. Make sure you check both numbers.
What if the fabric minimum is higher than my order needs?
You have three options: reduce the number of colours, choose a stock fabric, or launch the range in phases. We'll point out the difference before sampling so you can decide which approach works best.
How long does a first order take?
Sampling takes 7–12 days. Production takes 45–55 days after sample approval and deposit. Custom fabric may add extra time before production can begin.
Planning a first bike bag order?
Send us your SKU plan, target colours, and estimated annual volume. We'll check the three minimums — sample, bulk, and material — and explain where the real constraint is before you commit.
See how we control materials and quality: https://colorwaybag.com/bike-materials-and-qc
Send your SKU and colour plan: https://colorwaybag.com/contact-us
References
  1. Yagoo Bag — Materials and Quality Control: https://colorwaybag.com/bike-materials-and-qc
  1. Yagoo Bag — Custom Bike Bag Sampling: https://colorwaybag.com/posts/custom-bike-bag-sampling
  1. Yagoo Bag — Contact: https://colorwaybag.com/contact-us